The emergency generator or emergency battery is connected to() on most large ships.
A、the capstan
B、the collector
C、the panels
D、the surface
-
An emergence sea anchor may be constructed by type of extinguisher?().
A . a boat bucket
B . an air tank filled with water
C . an oar and canvas weighted down
D . All of the above
-
After an explosion,repair of emergency machinery and services should be accomplished().
A . after control of fire,flooding,and structural repairs
B . immediately,before the emergency is under control
C . after control of fire,but before control of flooding
D . after stability is restored
-
The generators on your rig have shut down,leaving you without navigation lights. Which emergency signal would you transmit over the VHF radio to alert vessels in the area of your predicament? ()
A . Mayday,Mayday,Mayday
B . Pan,Pan,Pan
C . Security,Security,Security
D . Lights out,Lights out,Lights out
-
The signal for a fire emergency on an OSV is().
A . a 30 second on 30 second off alternating signal
B . the continuous blast of the ships whistle for not less than 10 seconds supplemented by the continuous ringing of the general alarm bells for not less than 10 seconds
C . an intermittent ringing of the general alarm for not less than ten seconds
D . announced over the PA system
-
When securing an AC generator, you should FIRST ().
A . open the generator circuit breaker
B . switch the voltage regulator to “manual”
C . decrease the field excitation to minimum
D . reduce the load on the unit
-
If an emergency pump control is used as the emergency shutdown on a tanker,it must().
A . stop the flow of oil at the main deck manifold
B . prevent the oil from leaving the shore facility
C . prevent the oil from siphoning through the pump
D . None of the above
-
An emergency sea anchor may be constructed by using().
A . a boat bucket
B . an air tank filled with water
C . an oar and canvas weighted down
D . All of the above
-
When should the emergency position-indicating radio beacon be activated after abandoning an OSV?()
A . Immediately
B . After one hour
C . Only when another vessel is in sight
D . Only after sunset
-
A fire in an electrical generator is considered to be ().
A . Class "A"
B . Class "B"
C . Class "C"
D . Class "D"
-
I have an appointment with Dr. Johnson. --()
A . The appointment is put off
B . You look sick and weak
C . Please wait for minute. He is busy now
D . Tell me your ID number
-
The voltage output of an AC generator is controlled by()
A . varying the DC exciter voltage
B . varying the reluctance of the air gap
C . regulating the speed of the prime mover
D . shorting out part of the armature winding
-
Whattwo things must you do onthe router before generating an SSH key with the "crypto key generate rsa"IOS command? ()
A . Configure the SSH version that the router will use
B . Configure the host name of the router
C . Enable AAA Authentication
D . Configure the default IP domain name that the router will use
E . Enable SSH transport support onthe vty line
-
An emergency diesel generator should automatically shut down in the event of ()
A . dangerous over-speeding
B . a loss of lube oil pressure
C . activation of the fixed CO
system for the emergency generator space
D . all of the above
-
On a ship,each emergency generator must be tested at least once each().
A . week
B . month
C . three months
D . six month
-
Each emergency generator on a mobile offshore drilling unit,when tested,must be run under a full load for at least().
A . one hour
B . two hours
C . ten hours
D . four hour
-
Which of the listed sections of an emergency switchboard is used to supply power for alarm signals under emergency conditions?()
A . The generator and bus transfer section
B . The 450 volt, 60 cycle, 3 phase bus
C . The 120 volt, 3 phase, 60 cycle bus
D . The 24 volt DC bu
-
— You______park here! It's an emergency exit.— Thanks for telling me.
A.wouldn't
B.needn't
C.couldn't
D.mustn't
-
Standby or emergency diesel generator day tanks should always be kept full to reduce the possibility of__________.
A.sediment contamination
B.fuel filter clogging
C.moisture formation
D.inadequate transfer pump suction head
-
If an aircraft dispatcher cannot communicate with the pilot of an air carrier flight during an emergency, the aircraft dispatcher should
A、Take any action considered necessary under the circumstances.
B、Comply with the company’s lost aircraft plan.
C、Phone the ARTCC where the flight is located and ask for a phone patch with the flight.
-
What are the essential services the emergency generator must be rated to provide power for()?
A. emergency lighting for occupied areas,navigation lights
B. the driving motors of the emergency bilge pump,fire pumps,and steering gear
C. communications systems and alarm systems
D. all of the above
-
After resolving the trouble of main power supply, main switch of emergency generator should____, if power supply is refreshed.
A.be switched off by the duty officer
B.be switched on by the duty officer
C.be switched off automatically
D.be switched on automatically
-
Software quality assurance is now an emerging sub - discipline of(36). As Buckly and oston
Software quality assurance is now an emerging sub - discipline of(36). As Buckly and oston point out,(37) software quality assurance is likely to lead to an ultimate(38) of software costs. However, the major hurdle in the path of software management in this area is the lack of usable software(39). The development of accepted and generally applicable standards should be one of the principal goals of(40) in software engineering.
A.software engineering
B.software design
C.coding
D.testing
-
To obtain the greatest amount of information in an emergency, you should.
A.identify whether you yourself are safe or not
B.take a quick,calm and controlled approach
C.get to the emergency spot immediately
D.possess some first-aid skills
此题为多项选择题。