-
An emergence sea anchor may be constructed by type of extinguisher?().
A . a boat bucket
B . an air tank filled with water
C . an oar and canvas weighted down
D . All of the above
-
If the feed pump for an auxiliary boiler fails to deliver the feed water to the boiler, the cause maybe ().
A . high steam pressure in the boiler
B . abnormally high feed water temperature
C . abnormally high boiler water temperature
D . steam demand exceeding feed pump capacity
-
On a ship,a fire pump may be used for other purposes if().
A . the other services are run off a reducing station with a pressure gage
B . a separate fire pump is available for use on the fire main
C . all other services are operated by a manifold near the pump
D . All of the above
-
After an explosion,repair of emergency machinery and services should be accomplished().
A . after control of fire,flooding,and structural repairs
B . immediately,before the emergency is under control
C . after control of fire,but before control of flooding
D . after stability is restored
-
The various pumps and lines are () to some extent so that each pump can act as an alternative for another.
A . interlocked
B . interconnected
C . interfered
D . interacted
-
The effective pump stroke of an individual port-and-helix fuel injection pump is determined by the ()
A . fuel delivery pressure
B . pump plunger diameter
C . plunger control rack position
D . total pump stroke
-
The signal for a fire emergency on an OSV is().
A . a 30 second on 30 second off alternating signal
B . the continuous blast of the ships whistle for not less than 10 seconds supplemented by the continuous ringing of the general alarm bells for not less than 10 seconds
C . an intermittent ringing of the general alarm for not less than ten seconds
D . announced over the PA system
-
An emergency sea anchor may be constructed by using().
A . a boat bucket
B . an air tank filled with water
C . an oar and canvas weighted down
D . All of the above
-
Fire protection regulations for towing vessels require that drills be conducted on board the vessel as if there were an actual emergency. Drills include all of the following,EXCEPT().
A . testing all alarm and detection systems
B . breaking out and using the vessel's emergency equipment
C . participation by selected crew members
D . one person putting on protective clothing,if the vessel is so equipped
-
In the emergency alarm signals, if the alarm or whistle two long sounds followed by one short sound for 1 minute, it is the () emergency.
A . fire fighting
B . leakage blocking
C . abandon ship
D . integratio
-
An emergency diesel generator should automatically shut down in the event of ()
A . dangerous over-speeding
B . a loss of lube oil pressure
C . activation of the fixed CO
system for the emergency generator space
D . all of the above
-
If one hydraulic pump of an electro-hydraulic steering unit falls, the vessels steering can be initially and best maintained by using the ().
A . trick wheel
B . accumulator
C . standby pump
D . telemotor
-
On what type of pump would you find an impeller?()
A . Centrifugal
B . Gear
C . Piston
D . Vane
-
A fire pump may be used for other purposes if().
A . the other services are run off a reducing station with a pressure gage
B . one of the required pumps is kept available for use on the fire main system at all times
C . no relief valves are installed
D . all of the above conditions are met
-
If the plunger or barrel of a fuel injection jerk pump becomes damaged,()
A . only the replacement of the entire pump would be acceptable
B . the injection pump and injection nozzle must be replaced
C . either the barrel or plunger must be replaced
D . the barrel and plunger must be replaced as a unit
-
Which of the listed sections of an emergency switchboard is used to supply power for alarm signals under emergency conditions?()
A . The generator and bus transfer section
B . The 450 volt, 60 cycle, 3 phase bus
C . The 120 volt, 3 phase, 60 cycle bus
D . The 24 volt DC bu
-
If a hydraulic pump is overheating, the cause may be ().
A、excessive internal leakage in the pump
B、low discharge pressure and fluid flow
C、excessive fluid level in the hydraulic reservoir
D、operation of the pump at 100% efficiency
-
If an operating bilge pump is developing good vacuum, but is unable to discharge any water, which of the following problems is the most probable cause?()
A . The wearing rings are excessively worn
B . The suction strainer is clogged
C . The discharge valve is clogged
D . The shaft is wor
-
As for an oil-fired boiler if at a normal steaming condition and water goes out of sight in gauge glasses the action you should take is: () (1) secure oil to fires (2) increase feed pump pressure
A . (1)
B . (1)and(2)
C . (2)
D . neither(1)nor(2)
-
Fire protection regulations for towing vessels require that drills be conducted on board the vessel as if there were an actual emergency.Drills include all of the following,EXCEPT ______.
A.testing all alarm and detection systems
B.breaking out and using the vessel's emergency equipment
C.participation by selected crew members
D.one person putting on protective clothing,if the vessel is so equipped
-
If an aircraft dispatcher cannot communicate with the pilot of an air carrier flight during an emergency, the aircraft dispatcher should
A、Take any action considered necessary under the circumstances.
B、Comply with the company’s lost aircraft plan.
C、Phone the ARTCC where the flight is located and ask for a phone patch with the flight.
-
As for an oil-fired boiler if at a normal steaming condition and water goes out of sight in gauge glasses the action you should take is: (1) secure oil to fires; (2) increase feed pump pressure.
A.(1)
B.(1) and (2)
C.(2)
D.neither (1) nor (2)
-
Software quality assurance is now an emerging sub - discipline of(36). As Buckly and oston
Software quality assurance is now an emerging sub - discipline of(36). As Buckly and oston point out,(37) software quality assurance is likely to lead to an ultimate(38) of software costs. However, the major hurdle in the path of software management in this area is the lack of usable software(39). The development of accepted and generally applicable standards should be one of the principal goals of(40) in software engineering.
A.software engineering
B.software design
C.coding
D.testing
-
To obtain the greatest amount of information in an emergency, you should.
A.identify whether you yourself are safe or not
B.take a quick,calm and controlled approach
C.get to the emergency spot immediately
D.possess some first-aid skills
此题为多项选择题。