When ordering a new IBM Power Systems server, a customer is given the option of two types of Hardware Management Console:7042-CR4 and 7042-C06. Which main difference between the options would influence the customer's decision?()
A . The 7042-CR4 is a rack mounted model, compared to the 7042-C06, which is adesktop.
B . The 7042-CR4 is limited to 16 managed systems, compared to a limit of 32 for the 7042-C06.
C . The 7042-C06 has faster CPUs and twice the RAM compared to the 7042-CR4,which is suited to large enterprise deployments.
D . The 7042-C06 can manage POWER5-based hardware, in addition to POWER6, while the 7042-CR4 can only manage POWER6-based hardware.
-
An AIX 5.3 customer has a Power 780 in a 2-meter (T42) rack. This rack needs to be moved six inches (15cm) to allow under-floor access. What preparation for moving the rack will result in the least disruption to end-users?()
A . Initiate LPAR fallover to backup systems.
B . Use Live Partition Mobility to move the LPARs to other systems.
C . Use Live Application Mobility to move critical applications to alternate systems.
D . Back up all LPARS to a NIM server and restore them to other LPARs on other systems.
-
The Solutions Recommendation Guide is a framework for creating a customized SMB solution. Inorder to create a customized solution, which two components are needed?()
A . implementation ratings determined
B . specific products and technology available
C . benefits to the business decided
D . business capabilities enabled
E . business challenges identified
-
One of your best customers has limited funding and is interested in the ability to increase a system’s computing power as needed. Which of the following System x server attributes should the Sales Specialist promote?()
A . Ability to hot-plug additional processors on demand
B . Low cost of System x servers makes scaling out an option
C . "Pay as you Grow" scalability of the IBM System x3950 server
D . Integration of System x servers with the existing servers using an interconnect
-
A customer is consolidating seven IBM i partitions onto a POWER7 system, using VIO Server to virtualize resources.Which of the following PowerVM editions is appropriate for this customer?()
A . IBM i Edition
B . Express Edition
C . Standard Edition
D . Enterprise Editio
-
A customer has a new Power 720 with PowerVM Standard Edition. They plan to migrate their single-partition POWER5 550 to the new Power 720. How can the customer migrate from the POWER5 550 to the Power 720 with minimal effort and down time?()
A . Perform Live Partition Mobility between the two systems.
B . Move the boot disks from the old system to the new system.
C . Use Tivoli Storage Manager to back up the POWER5 550 and restore on the Power 720.
D . Upgrade AIX to the latest level on the POWER5 550 and clone using the mksysb command.
-
A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()
A . PCIe adapters
B . PCI-X adapters
C . PCI-X and PCIe adapters
D . PCI, PCI-X and PCIe adapter
-
A customer needs to share large files across three Power Systems servers to create and validate complex automotive designs. What IBM solution should be recommended?()
A . PowerHA SystemMirror
B . Peer to Peer Remote Copy
C . General Parallel File Systems
D . Parallel Operating Environment
-
A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server. Which limitation must be considered when planning the system configuration?()
A . A VIO server requires a dedicated LHEA port.
B . There is a limit of 32 LPARs per virtual LAN.
C . Two VIO servers will be required. A single VIO server can only provide virtual storage or Virtual Ethernet.
D . Two VIO servers will be required. One to provide virtual networking and another to provide dedicated networking.
-
A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server. Which limitation must be considered when planning the system configuration?()
A . A VIO server requires a dedicated LHEA port.
B . There is a limit of 32 LPARs per virtual LAN.
C . Two VIO servers will be required. A single VIO server can only provide virtual storage or virtual Ethernet.
D . Two VIO servers will be required. One to provide virtual networking and another to provide dedicated networking.
-
A large enterprise customer needs a standardized way to backup user data from multiple systems to tape. What solution will meet this need?()
A . backup command
B . Tivoli Storage Manager
C . Tivoli Disaster Recovery Manager
D . Store mksysb images on a NIM server
-
What is the standard power supply that is delivered with a BladeCenter H chassis for a North American customer?()
A . Redundant 2900W (2 x 2900 W)
B . Single 2900W (1 x 2900 W)
C . Single 2000W (1 x 2000 W).
D . Redundant 2000W (2 x 2000 W)
-
Customer purchased and x3650 M3 server and requires the ability to remotely power on and off the server. What if any additional hardware would the customer need to purchase to remotely power the server on and off?()
A . Visual Media Key (VMK)
B . Integrated Management Module (IMM)
C . Remote Supervisor Adapter (RSA II)
D . Advanced Management Module (AMM)
-
A customer has been quoted a DS8800. Which part of the TDA process would ensure that there isenough power in the customer location to operate the system?()
A . Pre-sale
B . Post-sale
C . Pre-install
D . Post-install
-
Which of the following provide for higher system availability on a single CEC Power 770 or Power 780?()
A . Redundant system clock
B . Redundant service processor
C . POWER7 cores include redundant L3 caches
D . Main memory DIMMs contain an extra DRAM chip for improved redundancy
-
A customer has the need for performance monitoring of an IBM System Storage DS8000. Which product does the customer need()
A . System Storage Productivity Center
B . Tivoli Storage Productivity Center for Data
C . Tivoli Storage Productivity Center for Disk
D . Tivoli Storage Productivity Center for Fabric
-
A customer has many RS/6000s and POWER4 systems running different AIX applications. What should the customer do to best position themselves for the migration to POWER5?()
A . Upgrade OS to AIX 5.2.
B . Implement Micro-Partitioning.
C . Upgrade HMC to support POWER5.
D . Install Partition Load Manager.
-
A customer has a 32-core Power 770 with 4 AIX partitions and 2 IBM i partitions. They want to improve network availability and allow for concurrent maintenance. What will support the customer requirement at least cost?()
A . Build the logical partition infrastructure based on 6 or more VLANs.
B . Build the logical partition infrastructure based on two or more IVEs.
C . Build the logical partition infrastructure based on Partition Mobility.
D . Build the logical partition infrastructure based on redundant VIO Servers.
-
Which of the following items in a single enclosure Power 770 improves Reliability, Availability, and Serviceability?()
A . Redundant system clocks
B . Redundant service processors
C . eDRAM chips have redundant L3 cache
D . Main memory DIMMs contain a redundant DRAM chi
-
If A customers needed to load-balance across multiple data center. which Cisco product would the customer consider?()
A . ACE Global Site Selector
B . Site Balancer
C . ISR Wide Area Acceleration Server
D . Nexus Site Balancer
E . ASR Virtual Balanced Network
-
A customer is unsure how POWER7 processors can outperform POWER6 processors when the clock speeds are slower. What contributes to the improved performance?()
A . Added Turbo memory switching
B . Removed internal OLTP limits
C . Moved L3 cache onto the chip
D . Increased DDR2 memory speed
-
A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()
A . PCIe adapters
B . PCI-X adapters
C . PCI-X andPCIe adapters
D . PCI, PCI-X andPCIe adapter
-
A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems. They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems. What is a key requirement that they need to plan for with the new HMC?()
A . A desk, as it not rack mountable
B . Ethernet connections to the POWER5 systems
C . Serial connections to the POWER5 systems
D . USB connections for the keyboard and mouse
-
How many points must a customer need to get free XL seats?
A.10,000
B.20,000
C.30,000
D.40,000