The bill of lading signed by the shipping company is()
The abandon ship signal sounded by the vessels whistle is ().
The Bill of lading signed by the shipping company is()
If the buoyant force on a ship’s hull is equal to the displacement tonnage,the ship will().
A load line of a ship is assigned by the().
On commonly used ships,if two A√Cgenerators are operated in parallel, the load is distributed evenly by ().
The maneuverability of the ship is considered()if the following criteria are complied with.
Prior to burning or welding on a fuel tank on a ship,regulations require that an inspection be made. An entry in the unofficial logbook is required if this inspection is made by().
A port is()if the delay in leaving it would be such as to frustrate the adventure.
The()is that search and rescue authorities ashore, as well as shipping in the immediate vicinity of the ship in distress, will be rapidly alerted to a distress incident so they can assist in a coordinated SAR operation with the minimun delay.
If a chartered ship is prevented from,or delayed in,getting to the loading port by peril excepted during the voyage,the exception clauses().
If fuel is burned from only the starboard tanks, the ship will ().
If no distress acknowledgement is received()a DSC distress call transmission, then the ship in distress may repeat the DSC distress call attempt after a delay of between 3.5 and 4.5 minutes from the beginning of the initial call.
If the ship is disabled by excepted perils while completing a voyage on which she was()at the time of chartering,the Shipowner will not be excused.
A load line for a ship is assigned by the().
If the Shipowner fails to give the Charterer the notice of readiness to load,and delay in commencing to load is thereby caused,the Charterer will (),as he is not bound to look out for the ship.
If the buoyant force on a ship’s hull is equal to the displacement tonnage, the ship cause().
The loadline certificate of a Chinese ship is issued by ().
We are afraid we will miss the 5:30 train if we are delayed by ______.
The goods ________ shipped already if your L/C had arrived by the end of December last.
If the work______completed by the end of the month is delayed, the construction company will be fined.
The legislative filibuster is a parliamentary tactic designed to delay or prevent action by the majority.
By what is the course of the ship controlled()?