-
Your customer has converted from traditional servers to BladeCenter technology and has a requirement for an RSA adapter on a new BladeCenter server. Which of the following options would you use? ()
A . Remote Supervisor Adapter II (RSA II Slimline)
B . Management Module, which comes standard on the BladeCenter
C . Acoustic Attenuation Module
D . Ethernet NIC
-
One of your customers has deployed a Layer 3 gateway in the untrusted network. Which gateway mode is appropriate for this customer?()
A . Virtual Gateway
B . Real-IP Gateway
C . NAT Gateway
D . Central Gateway
-
Your customer wants to build a network for a financial trading floor that has a requirement for multiple high-value transactions, which are also vital to the customer. What are the two most critical requirements? ()(Choose two.)
A . no single point of failure
B . trading database server location
C . redundant application servers location
D . deterministic response to all failures
E . determine which protocol to use
-
One of your customers has deployed a Layer 3 gateway in the untrusted network. Which gateway mode is appropriate for this customer?()
A . Virtual Gateway
B . Real-IP Gateway
C . NAT Gateway
D . Central Gateway
-
A customer has a very large number of physical Windows-based servers and no centralizedstorage. Which technology solution will help the customer reduce the footprint of their existingserver estate?()
A . z/OS, DS8000, TSM
B . TSM, LTO5, VMware
C . System x, VMware, XIV
D . System p, VMware, DS5000&e
-
A customer has 2 DS1s to add between adjacent nodes in a UPSR ring. What type of circuit should you recommend?()
A . VT circuits
B . STS circuits
C . VT tunnel circuits
D . 1:1 protection circuits
E . 1:N protection circuit
-
A customer has been receiving warning alerts on their storage units. All data is protected nightlyby a backup and has been tested without any issues. What should the customer do prior tocontacting IBM Support?()
A . collect all support data
B . implement a current backup
C . update all firmware levels
D . shut down the storage system
-
A customer has just received three enterprise systems that support a total of 48 LPARs. Which installation method expedite the process?()
A . Network installation manager
B . Boot from installation media
C . A migration install
D . Copy the system using the HMC
-
A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them. Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()
A . The technical support specialist has completed a UNIX course at college.
B . The technical specialist has supported several similar projects and has earned an IBM AIX certification.
C . The technical support specialist’s company sells $3M of UNIX computer systems every year.
D . The technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.
-
A customer recently purchased a new x3550 M3 server and one of the hard drives has failed. The customer has a standard warranty. They called you asking for a replacement. Which action should the customer take?()
A . Contact the IBM FTSS to replace the drive
B . Contact the IBM CSR or SSR to replace the drive
C . Order a replacement drive
D . Contact IBM Service
-
A customer has a critical, performance-sensitive web application that connects to a multimode Oracle RAC database. Which feature of WebLogic can provide signification benefit?()
A . The Web Session Affinity feature of Active GridLink for RAC
B . WebLogic Clustering
C . The Transaction Affinity feature of Active GridLink for RAC
D . Coherence*Web Session Replicatio
-
A customer has been quoted a DS8800. Which part of the TDA process would ensure that there isenough power in the customer location to operate the system?()
A . Pre-sale
B . Post-sale
C . Pre-install
D . Post-install
-
A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()
A . Dual power supplies.
B . Twice the amount of disk.
C . Two dual-port LHEA adapters.
D . Two dual-port fibre channel adapters.
-
A solution provider has identified a number of risks with a configuration in a customer’s request for bid. What is the most appropriate action to take to mitigate those risks for the customer?()
A . Decide not to bid.
B . Provide a solution in the bid.
C . Provide a disclaimer in the bid.
D . Discuss options with the customer.
-
A customer has the need for performance monitoring of an IBM System Storage DS8000. Which product does the customer need()
A . System Storage Productivity Center
B . Tivoli Storage Productivity Center for Data
C . Tivoli Storage Productivity Center for Disk
D . Tivoli Storage Productivity Center for Fabric
-
A customer has a wide range of IBM enterprise disk systems and wants to manage copy services functions. Which of the products should the storage specialist recommend to this customer()
A . DS Hardware Management Console (HMC), because it manages ESS 800, DS6000, DS8000, and SVC storage servers
B . Tivoli Storage Productivity Center for Data, because it manages ESS 800, DS6000, DS8000, and SVC storage servers
C . Tivoli Storage Productivity Center for Replication, because it manages ESS 800, DS6000, DS8000, and SVC storage servers
D . External DS Hardware Management Console (HMC), because it manages ESS 800, DS6000, DS8000, and SVC storage server
-
A customer has received a quotation from Dell for Intel-based 1U servers. What is the first step in submitting your quotation? ()
A . Try to sell IBM X-Architecture technology to the customer and explain its benefits.
B . Take the customer to the Dell Web site for determining a similar server configuration.
C . Submit a special bid to receive additional discount on 1U servers.
D . Design a comparable solution while highlighting IBM advantages.
-
A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()
A . Dual power supplies.
B . Twice the amount of disk.
C . Two dual-port LHEA adapters.
D . Two dual-port fibre channel adapters.
-
A customer has a requirement for a storage solution that meets the following criteria: (1)Heterogeneous hosts attached (2)Support for block I/O (3)High Speed (4)Scalable Which solution would satisfy the customer’s requirement?()
A . SAN
B . NAS
C . SCSI
D . iSCSI
-
A System p administrator has created a customized security profile using AIX Security Expert. Which of the following commands will apply this to a system()
A . aixpert -f mysec.xml
B . aixpert -a mysec.xml
C . chsec -f mysec.xml
D . chsec -a mysec.xml
-
Our company has a _ way of dealing with difficult customers.
-
It is/was the first time(that)she has/had ever taken a strong stand against raising taxes.
It is/was the first time(that)she has/had ever taken a strong stand against raising taxes.
-
The organization has __________ a campaign to raise money for the election.
A、take
B、launch
C、make
-
Any mistake made in the printing of a stamp raises its value to stamp collectors.A 21 on one inexpensive postage stamp has made the stamp 22 a million and a half times its original value.
The mistake was made more than a hundred years ago in the British colony of Mauritius, a small 23 in the Indian Ocean.24 1847 an order for stamps was sent to a London printer Mauritius was 25 the fourth country in the world to issue stamps.
Before the order was filled and delivered, a ball was planned at Mauritius'Government House, and stamps were needed to 26 the invitations.A local printer was instructed to 27 the design for the stamps.He accidentally inscribed the words “Post Office” 28 “Post Paid” on the several hundred stamps that he printed.
Today 29 only twenty-six of these misprinted stamps left, fourteen One Penny Orange-Reds and twelve Two Penny Blues.Because of the Two Penny Blue's rareness and age, collectors have paid 30 $16800 for it.
21.A.arrow
B.mistake
C.print
D.value
22.A.test
B.cause
C.course
D.worth
23.A.island
B.people
C.continent
D.land
24.A.Since
B.For
C.In
D.On
25.A.to appeal to
B.to become
C.to worry
D.to allow
26.A.deal in
B.deal with
C.send out
D.send for
27.A.decide
B.agree
C.steal
D.copy
28.A.instead of
B.instead for
C.in spite of
D.in need of
29.A.take out
B.there are
C.for example
D.X
30.A.as little as
B.as much as
C.so much
D.great deal